SH58 Haywards

Enhancing Safety

Project Information

Tascon played a pivotal role in enhancing safety along State Highway 58’s Haywards Hill by installing crucial road barriers, terminals, and foundations. The project encompassed nearly 2km of W Section Shoulder Barrier and 1.5km of Median Barrier. Notably, a significant portion of the shoulder barrier was installed over existing services, necessitating the installation of ground beams and a surface mount system.

Collaborating closely with Downer NZ, Tascon navigated design intricacies, applied specialised products, and efficiently managed traffic setups throughout the project. This collaboration ensured seamless execution and heightened safety measures along this vital transportation route.

Project Details

Location: Haywards Hill, SH58, Wellington, New Zealand
Client: Downer New Zealand
W Section Barrier Installed:

  • Driven: 1.1km
  • Surface Mount: 2.7km


Wire Rope Median Barrier:
2.1km
Motorcycle Protection Rail: 1km